Tošanovice-Žukov Bridge, Czech Republic

Projektitiedot

Yhteystiedot: Ostrava, Tšekki

Design: steel composite bridge
Length: 720 m

Vaatimukset

The strut axes open out from 6.50 m to 9.00 m in the centre of the bridge.

Asiakas

Metrostav a.s., Division 4, Prague

Asiakkaan edut

  • flexible connecting possibilities for steel walers, scaffold tubes, heavy-duty spindles and tie rods
  • can be adapted to various main beam spacings
Martin Šimek, Site Manager
Martin Šimek
Site Manager

The erection of steel composite bridges is considerably easier and much faster with the PERI formwork carriage construction.

PERI-ratkaisu

Two modular formwork carriages from the VARIOKIT system