The A52 Clifton Bridge, a major National Highways upgrade project in Nottingham, is a complex structure, which required repairs inside and underneath the bridge to strengthen the concrete.

Bridge Infrastructure

Deliver structures that are built to last.

We’ve supported a range of bridge-building and repair projects across the UK. No matter what type of bridge project you’re working on, our formwork, scaffolding and digital solutions can make construction simpler and safer.

Bridges are made of multiple structural components and are often located in challenging environments where access is limited, or traffic is still operational. We approach these types of multifaceted projects by engaging early with you to understand your requirements, align our operations with your construction schedule and help you safely deliver a structure that is built to last.

How we can support you

Below are just some of our solutions.

  • PERI products work together to deliver built-to-last structures.
    Delivering quality

    Achieve any highways design specification with our range of products. From flexible formwork to insightful sensor technology, we can help you achieve the desired result for your project.

  • PERI provides 3d modelling to enable clients to plan ahead and prevent risks.
    Forward thinking

    We’ve produced 3D modelling and animations for bridge projects to give site teams a better understanding of construction sequences, enabling them to plan ahead and prevent risks that might affect their programme.

    Here you can see a 3D render of our PERI UP Flex scaffolding birdcage and access solutions, which was used in the planning stage for the structural repair works on the A52 Clifton Bridge.

  • PERI can provide multiple services to assist with your projects.
    Available services for your project

      

Take a look at how we’ve supported bridge construction projects

Luton DART - 3D Pier Animation

  

  • Customer Testimonial
    Richard Fahey
    Contract Manager, NJ Doyne
    "What’s interesting about the tunnel is that its curved shape has been achieved by reusing straight formwork. The mobile solution for the pier table system has worked brilliantly and has reduced repositioning times, especially within the confined area."
Formwork

PERI Bridge Construction

VARIOKIT-järjestelmän pääosat: terästuet, kiipeilykiskot ja vinotuet.<br/>
PERI UP Flex -järjestelmäteline: Joustava työteline lähes kaikkeen.<br/><br/>
The lightweight for new construction and refurbishment projects
Työmaakulkutie helposti asennettavila askelmilla ja korkealla kuormituskapasiteetilla.
Kevyt, turvallinen ja nopea asentaa.<br/>
For wide-span working platforms and temporary pedestrian footbridges
Kaikki korkeudet, kaikki poikkileikkaukset, riippumatta siitä, ovatko ne neliön vai suorakaiteen muotoisia.<br/>
The heavy-duty prop with integrated load control<br/>HD
MDS K -tukitornijärjestelmän asennus ja purku tapahtuu aina turvallisesti integroitujen turvallisuusratkaisuiden ansiosta.
The system consists of different types of load and length optimized frames, which enable to continuously create every span with the corresponding combination.

Kysy lisää järjestelmistämme!

Ota yhteyttä myyntitiimiimme!

Ota yhteyttä